---
title: E. van Wijk
description: Grid congestion made it impossible to charge e-trucks via the existing connection. Together with Zonnegilde, we deployed 2,800 solar panels, a 1 MW / 4.3 MWh battery and intelligent EMS control to power charging locally. Electric trucks now run on self-generated solar energy, independent of the grid and ready for zero-emission zones.
---

[Cases ](https://iwell.eu/cases)

# [E. van Wijk](https://iwell.eu/cases/e.-van-wijk)

 Written by [Céline de Keersmaeker](https://iwell.eu/cases/author/céline-de-keersmaeker) | Sep 3, 2025 10:22:51 AM

 

[View full post](https://iwell.eu/cases/e.-van-wijk)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Céline de Keersmaeker"
  },
  "dateModified" : "2025-09-16T13:31:29.307Z",
  "datePublished" : "2025-09-03T10:22:51Z",
  "headline" : "E. van Wijk",
  "image" : {
    "@type" : "ImageObject",
    "height" : 877,
    "url" : "https://139856444.fs1.hubspotusercontent-eu1.net/hubfs/139856444/24368-DAF%20XD%20Van%20Wijk.jpg",
    "width" : 1400
  },
  "mainEntityOfPage" : "https://iwell.eu/cases/e.-van-wijk",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Cases"
  }
}
```